2024-2025 Sanitary Sewer Lining

Each year, the City of New Hope lines deteriorating areas of the sanitary sewer system. This process involves installing a cure-in-place fiberglass liner inside the existing sanitary sewer pipe. This greatly extends the pipe's lifetime without needing costly excavation and disruptions to city roadways and boulevards.

Pipe before lining
Pipe after lining
The pipe lining process
Pipe before lining
Pipe after lining
The pipe lining process